Mounting lnstructions
Determine vibrator placement on equipment.
Determine length of channel iron and style of mounting plate.
Attach vibrator to mounting plate. Check the mounting plate for warping
Install safety chain or cable.
Take a voltage reading while vibrator is running. Take an amperage reading while vibrator is running.
Instruction Reminders & Suggestions
Vibration Motor placement
For coarse materials: mount vibrator 1/3 of the distance from the discharge opening to the top of the sloped portion of the bin.
For fine materials: mount vibrator 1/4 of the distance from the discharge to the top of the sloped portion of the bin.
Mount on ironl steel channel
Overall length of vibrating motor unit should be perpendicular to length of channel, otherwise it may cause flexing & the vibrator may overload or standard burn out.
Restraint
Always install safety cable or chain: mount one end to the vibrator and theother to the hopper or bin above the vibrator. Do Not Attach To the Mounting Plate.
Operation temperature
lf the ambient temperature of the area exceeds 104°F(40°C) or if the skin.
Temperature of the application exceeds 150°F(66°C), please check situation of vibration motor, over temperature may reduce the lift-time of bearing.